Radon Mitigation Cost in Provo, UT2026
Estimate radon mitigation system cost in Provo, UT by foundation type, system style, number of suction points, fan grade, and electrical work.
Project Details
Total Estimated Cost
$1,843
Adjusted for local cost of living (+1%)
Cost Breakdown
Cost Distribution
Data sources: Base costs derived from national industry cost surveys and contractor pricing data, adjusted with BLS inflation indices, Census housing/income signals, and FRED CSV fallback when BLS data is temporarily unavailable. Regional adjustment (Provo, UT) based on U.S. Bureau of Labor Statistics Consumer Price Index data. Latest index refresh: April 2026.
Disclaimer: Estimates are approximate and for informational purposes only. Actual costs vary based on project complexity, contractor rates, material availability, and local market conditions. Always obtain multiple quotes from licensed contractors before starting a project.
Typical Project Cost by Foundation type
Adjusted for Provo, UT (+1%)Same default project size (default scope), priced across each material tier.
| Tier | Material rate | Total project | Installed per unit |
|---|---|---|---|
| Slab on grade | $896 | $1,644 | $0 |
| Full basement | — | $1,843 | $0 |
| Crawl space | — | $2,241 | $0 |
| Mixed / split-level | — | $2,539 | $0 |
Material rates reflect the latest BLS construction PPI adjustment. Installed totals include labor and supplies but exclude permits and any tear-out beyond the calculator's default scope.
Recent Cost Trends Affecting Provo
Wholesale construction prices typically lead homeowner-facing quotes by 2–4 months. Use the trend below to decide whether to pull a project forward or wait for the next reading.
Residential Construction PPI — Trailing 12 Months
BLS series PCU236211236211, single-family construction producer prices.
200.1
+0.9% vs Mar 25
The PPI is the wholesale price of materials and labor that contractors pay, before margin. A rising index usually flows into homeowner quotes within 2–4 months. Use this trend to decide whether to pull a project forward or wait.
Local Labor Rates Near Provo, UT
State-level mean hourly wages from BLS OEWS, May 2023.
| Trade | SOC | Mean hourly (UT) | vs national | Loaded billing rate |
|---|---|---|---|---|
| Construction LaborersMost relevant | 47-2061 | $21.30 | -6.5% | ~$51/hr |
| Electricians | 47-2111 | $30.20 | -6.2% | ~$72/hr |
| Plumbers & Pipefitters | 47-2152 | $29.85 | -9.1% | ~$72/hr |
| HVAC Mechanics | 49-9021 | $26.94 | -6.0% | ~$65/hr |
| Carpenters | 47-2031 | $25.10 | -13.3% | ~$60/hr |
| Painters | 47-2141 | $21.58 | -12.9% | ~$52/hr |
| Roofers | 47-2181 | $22.40 | -13.4% | ~$54/hr |
"Mean hourly" is the BLS OEWS state-level cross-industry mean wage paid to the worker. Loaded billing rate is a typical 2.4× multiple used in residential bids to cover overhead, insurance, taxes, vehicle, and contractor margin. Use it as a sanity check on a quoted hourly rate.
Best Months to Schedule Exterior painting in Provo, UT
Derived from NOAA climate normals for UT: heating/cooling degree days, freeze months, and annual precipitation.
Why these months
Latex paints cure best between roughly 50–85°F with low humidity. Cold, dry winters and hot, dry summers narrows the ideal cure window to these months.
Booking tip
Schedule exterior paint at least 24 hours after the last rain and avoid days with heavy dew.
Radon Mitigation Cost by City
Browse all 202 cities by state
Alaska
Arkansas
California
Connecticut
Delaware
District of Columbia
Florida
Hawaii
Idaho
Illinois
Indiana
Kansas
Kentucky
Maine
Maryland
Minnesota
Mississippi
New Hampshire
New Jersey
New Mexico
North Carolina
North Dakota
Oklahoma
Pennsylvania
Rhode Island
South Carolina
South Dakota
Texas
Vermont
West Virginia
Wyoming
Local Market Context for Provo, UT
This Provo page currently uses modeled local pricing based on west regional CPI, state-level Census signals, metro premium assumptions, and the same project formulas used across the rest of the site.
Relative cost level
1% above national
This reflects the city multiplier currently applied to labor-sensitive project costs.
Local data source
Modeled regional CPI
This city currently uses regional CPI, state housing data, and metro premium modeling.
Market profile
West · 115K city population
Region and city size help explain labor pressure, contractor demand, and housing-stock mix.
Compare Nearby Markets
Check the same calculator in nearby or same-region cities to see how the local multiplier changes the estimate.
Radon Mitigation cost in Ogden
Utah market · smaller metro · 98 cost index · ~3% lower than Provo
Compare Radon Mitigation pricing in Salt Lake City, UT
Utah market · smaller metro · 109 cost index · ~8% higher than Provo
Billings radon mitigation estimates
West market · smaller metro · 92 cost index · ~9% lower than Provo
How much radon mitigation costs in Temecula
West market · smaller metro · 114 cost index · ~13% higher than Provo
Radon Mitigation prices around Surprise
West market · smaller metro · 97 cost index · ~4% lower than Provo
Escondido, CA radon mitigation budget
West market · smaller metro · 115 cost index · ~14% higher than Provo
Local radon mitigation estimate for Pomona
West market · smaller metro · 108 cost index · ~7% higher than Provo
Radon Mitigation near Bellevue
West market · smaller metro · 122 cost index · ~21% higher than Provo
Average Cost in Provo, UT
For a typical radon mitigation scenario in Provo, UT, this calculator currently models a total around $1,843.
When budgeting Radon Mitigation in Provo, local quotes usually reflect conditions across Utah. Water-conservation landscaping rules and alkaline soils in Utah affect outdoor project planning differently than wetter states.
Smaller markets like Provo can see fewer specialty crews on short notice, so scheduling and travel minimums sometimes matter more than in major cities.
For projects around Provo, UT, the fastest way to compare apples-to-apples is aligned scope: materials, tear-out, permits, and cleanup.
Annual weather in Provo (12" of rainfall, ~4 freezing months) typically influences both crew scheduling and exterior product specs.
Utah's housing stock skews to newer suburban single-family with cold-climate envelopes, which gives Provo contractors a fairly consistent set of structural and finish patterns to bid against.
In Provo, modeled costs are currently about 1% above the national baseline. That usually reflects a mix of smaller metro labor pricing, subcontractor availability, and broader west regional cost pressure.
Local labor conditions, permit timing, and finish selection all influence how this project prices in Provo.
Low / Mid / High Project Scenarios
Low Scenario
$1,091Single-point passive system on a slab home with existing outlet.
Mid Scenario
$1,851Active sub-slab depressurization on a basement with one suction point and short-term post-test.
High Scenario
$4,924Sub-membrane crawl-space system on a split-level with three suction points, premium fan, and continuous monitor.
What Changes the Estimate Most in Provo?
- Foundation type sets the baseline: slab is cheapest, basement is mid-range, and crawl space requires sub-membrane work that costs more.
- Number of suction points is driven by foundation complexity — split-level and large homes commonly need 2–3 points.
- Fan grade and electrical work (existing outlet vs new circuit) account for $200–700 of variation between similar systems.
When This Calculator Is Less Accurate
This calculator is less accurate when the home has multiple disconnected foundations, sub-slab voids that require sealing before depressurization, very high baseline radon (>20 pCi/L) needing multi-fan or HRV-integrated systems, or commercial-scale buildings.
Use the result as a budgeting starting point, then validate with local contractor quotes if the scope includes specialty materials, hidden damage, or permit-driven design changes.
How Much Does Radon Mitigation Cost in Provo?
A residential radon mitigation system typically costs $800–3,000 installed, depending on foundation type, system style, number of suction points, fan grade, and electrical work. Active sub-slab depressurization on a single-foundation slab home is on the low end; sub-membrane crawl-space systems and drain-tile or sump-integrated designs cost more. EPA Zone 1 areas (most of the Midwest, Appalachia, Mountain West) see the highest demand.
Cost Factors:
- Foundation type — slab is cheapest, basements are mid-range, and crawl spaces or split-levels cost more
- System type — passive systems are cheaper but less effective; active sub-slab depressurization is the standard
- Suction points — single-point systems cover most homes; complex foundations need multiple points at ~$350 each
- Fan grade — standard, high-suction, and ultra-quiet premium fans span a 2× range
- Electrical and venting routing — new outlets, attic runs, and rooftop terminations add labor time
In Provo, home improvement costs are 1% above the national average. This reflects local labor rates, material availability, and cost of living in the Provo metro area.
Frequently Asked Questions (5)
How localized is the Radon Mitigation estimate for Provo, UT?
This page applies a West regional cost model plus local signals for Provo, UT, so totals are modeled close to a national baseline before you change inputs. Use it as a budgeting range, then compare written quotes for your exact scope.
What should I verify with contractors in Provo?
Confirm permits, HOA or historic-district rules, material lead times, and whether demolition or hidden damage is included. Utah codes and local inspection steps can change both price and schedule compared with national averages.
How much does a radon mitigation system cost?
Most active radon mitigation systems cost $800–3,000 installed. A simple single-suction-point system on a slab or basement runs $900–1,500, crawl-space sub-membrane systems land $1,800–3,000, and complex multi-point installations on split-level homes can reach $3,500–5,000.
Do I need a radon mitigation system?
The EPA recommends action when indoor radon levels are 4 pCi/L or higher; many health authorities recommend mitigation above 2 pCi/L. Test your home — short-term radon test kits cost $20–40, and any home in EPA Zone 1 should be tested every few years and after major foundation work.
How long does a radon mitigation system last?
The PVC venting and sealing typically lasts 20+ years. The radon fan itself is the wear item, with a lifespan of about 5–10 years for standard models and 10–15 for premium ultra-quiet units. Most systems include a manometer that lets homeowners monitor function at a glance.
Data sources & methodology
Estimates blend national base costs, the BLS residential construction PPI, regional and direct metro CPI series, BLS OEWS state labor wages, and U.S. Census ACS housing signals. Market data refreshed April 2026. Expect ±15–30% spread vs an actual contractor quote.
Explore Related Project Costs
These are common next-step comparisons for people researching radon mitigation in Provo.
Radon test in a full home inspection
Home Inspection Cost Calculator
Useful when bundling a radon test into the broader pre-purchase inspection.
Radon mitigation with sump pump
Sump Pump Installation Cost Calculator
Helpful when integrating radon depressurization with existing or new sump systems.
Radon plus crawl-space encapsulation
Crawl Space Encapsulation Cost Calculator
Compare two related crawl-space sealing projects often planned together.
Related Calculators
Sump Pump Installation Cost Calculator
Estimate sump pump installation costs by pump type, pit work, backup, and discharge.
Basement Waterproofing Cost Calculator
Estimate basement waterproofing costs by size, method, drainage, sump, and protection scope.
Crawl Space Encapsulation Cost Calculator
Estimate crawl space encapsulation costs by area, liner system, drainage, and dehumidification.